Infrastructure

Production Capacity:

  Weaving : 2.5 Ton/Day
  Processing : 3.5 Ton/Day
  Finishing : 6.0 Ton/Day

Weaving Equipments:

  50 Terry Loom of 80 inches Read Space.
  Maximum Fabric width is 76 inches.
  2 Full set of Warper Machine.
  Full set of Cone Winder and Pirn Winder.
  Total production capacity is 2500 Kg/Day.

Processing Equipments:

  Bleaching Kier
  3-Pass Boiler
  Rope Washing
  Closed Winch
  Tensionless Dryer
  Hydro Extractor